Polariz Gen-E loading
POLARIZ | GEN-E Powering Clean Energy
FOR BUSINESS · GEN-E BESS

Industrial power, stored.

Containerised battery energy storage for factories, resorts, hospitals and commercial buildings, from 125 kW to 2.5 MW. Sized to your load and installed by Polariz.

Request a Proposal Free Sizing Study
Containerised battery energy storage system beside solar field and palm trees
125 kW – 2.5 MW
Six standard power ratings
241 kWh – 5 MWh
Energy per system
≈ 2 hours
At full rated power
GEN-E BESS · 04

Designed for maximum commercial ROI.

01

Cut peak demand charges

Discharge during your peak hours to lower the maximum demand billed by the DISCOM.

02

Store your solar

Bank surplus daytime solar and use it in the evening instead of exporting it cheaply.

03

Run less diesel

Carry loads through outages and cut DG run hours and fuel bills.

04

Protect critical loads

Keep process lines, cold rooms and servers running through grid dips.

GEN-E BESS · 05

Six systems. One platform.

Containerised solutions from a single 125 kW unit up to a 2.5 MW / 5 MWh plant.

GEN-E BESS
125 kW / 241 kWh
≈ 1.9 h at rated power
Shops & offices
GEN-E BESS LIQUID-COOLED
125 kW / 261 kWh
≈ 2.1 h at rated power
Hot sites, tight spaces
GEN-E BESS
250 kW / 482 kWh
≈ 1.9 h at rated power
Resorts, hospitals
GEN-E BESS
500 kW / 1 MWh
≈ 2 h at rated power
Mid-size factories
GEN-E BESS
1 MW / 2 MWh
≈ 2 h at rated power
Large plants, campuses
GEN-E BESS
2.5 MW / 5 MWh
≈ 2 h at rated power
Industrial & solar parks

Duration is energy divided by rated power. Detailed datasheets for each system are available on request. Specifications may change without notice.

GET A FREE SIZING STUDY

How the sizing study works.

01

Share your data

Share 12 months of electricity bills and your DG run logs.

02

Load & solar modeling

Polariz models your load, tariff and solar to size the system.

03

Detailed proposal

You get a proposal with capex, savings and payback.

Polariz engineer conducting BESS commissioning inspection
INDICATIVE ASSESSMENT

Indicative Demand & Fuel Savings Calculator

Estimated Monthly Cost Reduction Potential:
₹1,15,000 – ₹1,70,000 / month
* Illustrative model based on 25–40% peak demand shaving and 40–60% diesel substitution. Sizing depends strictly on DISCOM tariff structures, TOD slabs, and plant load profiles.
APPLICATION FORM

Request a Commercial BESS Proposal

Submit your plant requirements for an engineered feasibility report.

1
Contact
2
Facility
3
Goals & Upload

Step 1: Contact Details

Please enter your company name
Please enter contact name
Valid 10-digit number required
Valid email required

Step 2: Facility & Energy Parameters

Step 3: Primary Goals & Bill Upload

Sharing recent bills allows us to calculate exact peak TOD tariffs and sizing.